💡 Light Up Your Ideas with Wizzo!
The Wizzo 50 Pieces 3W Super Bright White SMD LED Diode Chip Light Bulb Lamp is a versatile lighting solution perfect for science projects and DIY hobby kits. With a cool white color temperature of 6500K and a high Color Rendering Index of 95, these LEDs ensure vibrant and accurate color representation. Each pack contains 50 diodes, providing ample supply for various applications, all powered by a 3V-3.6V input.
Unit Count | 50.00 count |
Connectivity Technology | DC |
Colour Temperature | 6500 Kelvin |
Light Color | Cool White |
Controller Type | Push Button |
Wattage | 3 Watts |
Light Type | LED |
Indoor Outdoor Usage | Indoor |
Color Rendering Index | 95 |
Additional Features | 3 Watt |
Light Source Type | Led |
Power Source Type | Corded Electric |
Light Source Wattage | 3 Watts |
Specific Uses For Product | Lamp |
Trustpilot
4 days ago
2 weeks ago